Download

Factory Operation Certificate

ໃບຢັ້ງຢືນດໍາເນີນກິດຈະການໂຮງງານ

General information
Name of formality Factory Operation Certificate
Type of formality Certificate
Date of last modification 16.11.2020
Responsible Authorities Department of Industry and Commerce
LSIC C - Manufacturing
Who should complete this business formality?
Those who operate factories
Qualifications needed by the business to get the formality

                                                    
Additional Comment
Prior to the permanent production, factory business operators must apply for a factory operation certificates from the industry and handicraft sector first.

LEGAL FRAMEWORK
Name Number Date Comment
Law on Handicraft 02/NA 25.07.2008
Industrial Processing Law (Amended) 48/NA 27.12.2013
Presidential Ordinance on Fees and Service Fees 003/PO 26.12.2012 Article 12
No name 0166/ອຄ 09.02.2023
Devision on Factory 0166/MOIC 09.02.2023 Article 2, 12, 13, 14, 16, 17, 18 & 51 ""

REQUIRED DOCUMENTS FORMALITIES - First time
Name Type Comment
Application Form Confirmative act
                                                                        as defined in an application form by Industry and Handicraft Sector 
Power of Attorney Confirmative act
                                                                         
Manufacturing Plan Confirmative act
                                                                        with the explanation  
List of the machines in the factory Confirmative act
                                                                         
Annual Operation Plan of the Factory Confirmative act
                                                                        as defined in the application form by the Industry and Handicraft Sector 
Construction Layout Confirmative act
                                                                        attach with the technical system of the machines in A3 size (the layout has to be in compliance with the construction regulations) 
Photo (3x4) Confirmative act
                                                                        4 photos (taken within 3 months) 
Copy of Enterprise Registration Certificate Confirmative act
                                                                         
Environmental Compliance Certificate (ECC) Formality
                                                                        for the factory that has impacts on the environment 
Construction Permit Formality
                                                                         
Certificate of Installation of Waste Management System Confirmative act
                                                                        and/or Certificate of Waste Disposal from the factory 
Land Lease Agreement Confirmative act
                                                                        or Lease Agreement (for building) or Ownership Certificate, and Land Title 
Quality Certificate of Products Confirmative act
                                                                         
Quality Certificate of Products Confirmative act
                                                                        for food, drinks, and medicines 

REQUIRED DOCUMENTS FORMALITIES - Renew
Name Type Comment
 
Mean of presentation
Means of presentation At the Authority Offices
Address of authority
Processing Time (Day(s)) 5 In case the document is in correct or incomplete the authority must inform the applicant within 5 days from the date of receiving in order to correct it
 
RENEWAL INFORMATION
Does the formality have a validity or an expiration date? YES
How long will the formality be valid for? (in months) 36
What is the process and conditions to get the formality?
What is the process and conditions to renew the formality? The application must be submitted 30 days before the due date
 
ISSUING FEES
Has application fees? Service fees Certificate fees Application fees Total fees
YES 50000.00 50000.00 0.00 100000.00
Comments
The fee will be collected based on the horsepower as stated in Ordinance No. 003/PO 
 
RENEWAL FEES
Has renewal fees? Service fees Certificate fees Renewal fees Total renewal fees
YES 50000.00 40000.00 0.00 90000.00
Comments
The fee will be collected based on the horsepower as stated in Ordinance No. 003/PO 
     
 