Download

Factory Operation Certificate

ໃບຢັ້ງຢືນດຳເນີນກິດຈະການໂຮງງານ

General information
Name of formality Factory Operation Certificate
Type of formality Certificate
Date of last modification 20.11.2020
Responsible Authorities Department of Industry
LSIC C - Manufacturing
Who should complete this business formality?
Those who operate factories
Qualifications needed by the business to get the formality
The factory must meet the condition and standard, be able to produce an experiment then can apply for a Factory Operation Certificate
Additional Comment
Prior to the permanent production, factory business operators must apply for a factory operation certificate from the industry and handicraft sector first.

LEGAL FRAMEWORK
Name Number Date Comment
Law on Handicraft 02/NA 25.07.2008
Industrial Processing Law (Amended) 48/NA 27.12.2013
Presidential Ordinance on Fees and Service Fees 003/PO 26.12.2012 Article 12
Devision on Factory 0166/MOIC 09.02.2023 Article 2, 12, 13, 14, 16, 17, 18 ""
No name 0167/ອຄ 09.02.2023

REQUIRED DOCUMENTS FORMALITIES - First time
Name Type Comment
List of the machines in the factory Confirmative act
                                                                         
Application Form Confirmative act
                                                                        by the Industry and Commerce Sector 
Power of Attorney Confirmative act
                                                                         
Manufacturing Plan Confirmative act
                                                                        attach with the explanation 
Annual Operation Plan of the Factory Confirmative act
                                                                        as defined in the application form by the Industry and Commerce sector 
Construction Layout Confirmative act
                                                                        and the technical system of the factory (in A3 paper size) that complies with the construction regulations 
Photo (3x4) Confirmative act
                                                                        4 photos (taken within 3 months) 
Copy of Enterprise Registration Certificate Confirmative act
                                                                        Investment License or Business Operating License of Industry and Handicraft 
Environmental Compliance Certificate (ECC) Formality
                                                                        (copy) for factories that have impacts on the environment 
Construction Permit Formality
                                                                        copy 
Certificate of Installation of Waste Management System Confirmative act
                                                                        and/or Waste Disposal Certificate 
Land Lease Agreement Confirmative act
                                                                        or Building Lease Agreement or Ownership Certificate of land and Land Title  
Quality Certificate of Products Confirmative act
                                                                        for food, drinks, and medicine products 

REQUIRED DOCUMENTS FORMALITIES - Renew
Name Type Comment
 
Mean of presentation
Means of presentation At the Authority Offices
Address of authority Department of Industry, Ministry of Industry and Commerce
Processing Time (Day(s)) 5 - In case the document is incorrect or incomplete the authority must inform the applicant within 5 days from the date of receiving in order to correct it. - If the document is accurate and complete in accordance with the condition and standard, a certificate will be issued within 5 working days.
 
RENEWAL INFORMATION
Does the formality have a validity or an expiration date? YES
How long will the formality be valid for? (in months) 36
What is the process and conditions to get the formality?
What is the process and conditions to renew the formality? The application must be submitted 30 days before the due date
 
ISSUING FEES
Has application fees? Service fees Certificate fees Application fees Total fees
YES 0.00 0.00 0.00 0.00
Comments
The fee will be collected based on the horsepower as stated in Ordinance No. 003/PO 
 
RENEWAL FEES
Has renewal fees? Service fees Certificate fees Renewal fees Total renewal fees
YES 0.00 0.00 0.00 0.00
Comments
The fee will be collected based on the horsepower as stated in Ordinance No. 003/PO 
     
 